222 Hennepin Ave.

Description of Project:

New construction that will contain two connected buildings; one six story and one seven story, anchored by Whole Foods. The existing parking ramp is being salvaged and the new building is going up around it.

Major Challenge:

Two unique towers on the corners of Hennepin and 1st Ave. North. The towers are being constructed out of light gauge load-bearing metal framing, along with prefabricated metal roof trusses. The fast track schedule of the building has an opening slated for summer 2013.

Additional Info

  • Location: Minneapolis, MN
  • Scope of Contract: Metal Framing, Spray Polyurethane Foam Insulation, Drywall, Fireproofing, EIFS
  • Architect: Ryan Cos. US, Inc.
  • General Contractor: Ryan Cos. US, Inc.