Description of Project:
Turning existing Hotel pool area into a smoke free Casino and bar/lounge area. Constructing a small addition with fireproofing and EIFS to match existing.
Major Challenge:
Interior buildout of new Casino area on a fast tract schedule as it was designed. Constructing detailed, curved soffit system in bar/lounge area within a short schedule.